The abort system will be capable of pulling the crew module away from the Ares 1 crew launch vehicle within milliseconds in the event of an emergency on the pad or during the initial ascent phase. Army's White Sands Missile Range in New Mexico for the first test, called Pad Abort-1, of the launch abort system. JSC2009-E-121676 (May 2009)- Built by Aerojet, Orion's jettison motor was prepared for shipment from Sacramento, Calif to the U.S. JSC2009-E-121677 (May 2009)- Built by Aerojet, Orion's jettison motor was prepared for shipment from Sacramento, Calif to the U.S. JSC2009-E-121678 (May 2009)- Built by Aerojet, Orion's jettison motor was prepared for shipment from Sacramento, Calif to the U.S. JSC2009-E-121679 (May 2009)- Built by Aerojet, Orion's jettison motor was prepared for shipment from Sacramento, Calif to the U.S. JSC2009-E-121680 (May 2009)- Built by Aerojet, Orion's jettison motor was prepared for shipment from Sacramento, Calif to the U.S.
0 Comments
Leave a Reply. |